Data infrastructure consulting
Networks that have to survive the field.
Fiber, wireless, hybrid, and the programs that take them from requirements through plant install — for municipal, utility, public-sector, and industrial networks.

First to field
Satellite-on-vehicle AG solution: first U.S. customer installs in nine months, under a $2.0M target.
Carrier layer
Three global carriers: 30% cost reduction, 8× acreage coverage, 3× airtime and data capacity.
Public-sector plant
Hill Country WISP turned around; a fiber integrator stood up for cities outside the incumbent footprint.
What we do
Architecture, programs, and the last mile of the drawing.
Parker’s Choice is independent consulting for data infrastructure — fiber, wireless, hybrid, carriers, and plant integration. Engagements run as a project, a fraction of a leadership seat, or a retainer. The work is the same: own it through install.
All servicesArchitecture & hybrid design
Fiber, wireless, PTP / PTMP, WAN / LAN, and the hybrids that actually get built. Designed to a ten-year horizon, not a catalog sheet.
Industrial & private wireless
Kinetic mesh, private LTE/5G, plant Wi-Fi, and the integration work that puts radios on platforms instead of leaving them in a lab.
Municipal & utility networks
Public-sector fiber and wireless for cities, utilities, schools, hospitals, and emergency operations — including the regulatory and funding path.
Program leadership
Someone who will own the budget, the schedule, the vendors, and the plant integration — not just the kickoff deck.
Carriers, satcom & SLAs
Carrier negotiation, airtime and coverage math, and satcom-to-vehicle or site integration when terrestrial paths are not enough.
Field engineering & vendors
Requirements from the customer site, through procurement, through install. The last mile of the drawing is still the work.
Who we work with
Cities, utilities, and industrial operators.
01
Municipal, utility & public sector
City, county, school, hospital, EOC, and utility networks — fiber, wireless, and hybrid designs that have to clear rights-of-way, joint builds, and public funding, then stay in service.
02
Industrial plants & OEM platforms
Plant integration, private wireless, and connectivity that has to live on equipment in the field. Mining, manufacturing, and original-equipment programs included.
03
Oil, gas & remote operations
Kinetic mesh, hybrid backhaul, and satcom where the site is moving, isolated, or both. Architecture that matches how the operation actually runs.
Selected work
Outcomes, not a résumé.

CNH Industrial
Satellite on the vehicle, first U.S. installs
Led a tiger team from first discussion to first U.S. customer installs of a first-in-market satellite-on-vehicle AG solution. Nine months. $1.6M actual against a $2.0M target.

Global connectivity portfolio
Carrier deals that changed the coverage map
Negotiated with three global carriers on a live OEM connectivity portfolio: 30% cost reduction, 8× acreage coverage, and 3× baseline airtime and data capacity.

CNH Industrial
An $8M connectivity portfolio, run as operations
Owned the annual connectivity budget covering operations, R&D, automated test fixtures, training, and carrier partnerships. Directed a hybrid Agile/Waterfall team of program managers across development, plant integration, and adoption, with a 98% risk-mitigation clear rate.
Sister company
Texas Fiber Exchange
Sister company. Texas-wide WAN and fiber interconnects for data centers, engineered from a network core hub in Marble Falls. Parker’s Choice is the consulting practice — architecture, programs, and field delivery. Texas Fiber Exchange is the interconnect company.
Visit texasfiberexchange.netStart a conversation
If the network has to work, write.
Marble Falls, Texas. (512) 636-2309. Prefer email — we will follow up.

